Skip to main content

EBUNGE Partition

Toilet Partition Project Quotation Checklist

Organize the information needed for quotation. Start with the minimum information and build toward a confirmed project package; an early enquiry does not require every selection to be final.

Minimum information

Provide the project country and facility type, approximate cubicle quantity, and a plan, marked sketch or overall opening dimensions. Identify related urinal screens or lockers separately when included. State which dimensions are measured and which are estimates.

Recommended information

Add the preferred panel construction, material and finish direction. Mark door swings, circulation and privacy priorities. Record hardware preferences and the floor, wall or ceiling conditions that may affect mounting. Include the required delivery timing if known.

Complete project package

Before final approval, coordinate plans and elevations, the opening and cubicle schedule, finish references or approved samples, hardware schedule, delivery destination and required timing. Keep drawing revisions identifiable so earlier dimensions are not mistaken for current instructions.

Use the checklist in your enquiry

Summarize the available information in Project Details or email the project brief. Discuss a suitable transfer method for drawings; the current staging form has no verified file-upload control. Confirm final construction, performance, packing and delivery scope for the actual project.