PROJECT CHECKLIST

Organize the information needed for quotation.

Start with the minimum information and build toward a confirmed project package.

KEY FACTS

What is the minimum information for a toilet partition quote?

Provide the project country, facility type, approximate quantity and a layout, sketch or opening dimensions. Material, color, hardware and delivery details improve accuracy but can be reviewed after the first inquiry.

  • Project country and application
  • Approximate cubicle, screen or locker quantity
  • Layout drawing, sketch or dimensions
  • Preferred product or material direction
  • Required delivery timing, if known

Minimum information

Project country and facility type

Approximate quantity

Layout, sketch or overall openings

Recommended information

Panel material and finish direction

Door direction and privacy priorities

Hardware preference and site conditions

Complete project package

Approved plans and elevations

Opening and cubicle schedule

Color codes or approved samples

Delivery destination and required timing

Specification note
Reviewed by the EBUNGE project team · Updated July 2026

Based on confirmed product information and general project coordination practice. Final construction, performance and installation requirements must be confirmed for each project.

Save or share this checklist.

Print / Save as PDF

START A PROJECT

Turn the checklist into a quotation brief.

Include the layout drawing, opening size, quantity, panel color, hardware preference, and project country. Early-stage information is welcome.